Inspection Checklist Overview
Setup Checklists
1403 Inspection Checklist
Inspection checklist for Rule 1403 Asbestos removal / Demolition
1403
Seq # Section Item Title Item Type Actions
1 Demolition or renovation work going on at time of inspection Yes/No
21 Wet demolition with no dust, track-out, water run-off (403) Yes/No
3 Permitted Vac-loader; Filling for HEPA vacuum, negative air machine, ICE, etc. Yes/No
4 Distributed, handled or removed ACM & PACM that contain more than 1 % asbestos Yes/No
5 Disturbed, handled or Removed more than 100 square feet of ACM & PACM. Quality Yes/No
6 1403(d)(1) Sec WORK SITE REQUIREMENTS Header
7 A Asbestos Survey prior to demolition and/or renovation Yes/No
8 A(viii) Asbestos Survey conducted by a Certified CAL OSHA Surveyor Yes/No
9 B Notification postmarked 10 working days prior to renovation / demolition Yes/No
10 B(v) Notification updates submitted as required (revisions) Yes/No